The Isolation Test is done by utilizing an inflatable test ball/plug, maneuvered throughout the sewer lines, with the help of a camera, to isolate and identify the locations of the leak(s).

In other words, we're just checking to ensure the pipe is still round and not displaced under its current load. 2nd step: Place the Pipe Plug and the Pipe Test Plug, which is connected with the air discharge adapter, in the pipeline that should be tested. The straightness of the sewer . 6. Procedure for Air Testing of Sewer Pipe & Appurtenances (1) Summary of Method: Plug the section of the sewer line to be tested. 2. Mandrel testing for flexible sewer pipes.

The leakage pipe if any will also be replaced. END OF SECTION 33 01 10.13

Pour the dye inside the toilet bowl or into an under sink drain trap. Step # 1. The Low Pressure Air Loss Test outlined above is the standard test procedure. PVC Sewer Pipe: 02715 2. (2) The Contractor may desire to make an air test prior to backfilling . This leakage test is done by the following steps: This is done by performing a low-pressure air test. Get your South FL Home Tested Today

Determine groundwater elevation above spring line of pipe. The infiltration test shall be used when the groundwater level is at least 2 feet above the crown of the pipe measured at the upstream manhole. B. Excavation of Trenches, Timbering and Dewatering 4. 3. The test starts by pulling the mandrel from one end of the pipe to the other. For ductile . If these locations pose a challenge, simply flush the dye down inside your toilet (see below). Verifies the integrity of new sewer lines. Setting out Sewer Centre Line 2. Testing of Pipe Sewers 6. as not to cause a failure of this test. Use the quantity and rate of air loss to determine the acceptability of the section being tested. Include all costs for testing, required by this Section in the bid prices for manholes, pipe, and appurtenant structures.

C. Procedure .

Afterwards the air is expelled out, stop cock is closed and the reading is noted after 30 minutes. 2. laying of sewage pipe consist of the following steps. Immediately before performing line acceptance test, remove cap, clear pipe . Procedures and test criteria for water infiltration and exfiltration tests of concrete pipe sewer lines are prescribed in ASTM C969. The water is then filled in the manhole at the upper end and is allowed to flow through the sewer line. 2.

In other words, we're just checking to ensure the pipe is still round and not displaced under its current load. Measurement and Payment Procedures 1. Related Work Specified Elsewhere 1. The smoke testing technique is uncomplicated and can be performed by regular maintenance crew members (2 or 3) who quickly master the fundamentals. Identify test areas: Identify areas of the sanitary sewer system that experience inflow during wet weather.

Can also verify workmanship of newly installed sewer lines. 4. 6.2 The manholes, the ends of the branches, laterals, wyes and stubs to be included in the test shall be plugged.

This type of test is used to determine that the ovality of the sewer pipe meets its specification. The water is filled through a funnel connected at the lower end provided with a plug. 1. The sewers are tested by plugging the upper end with a provision for an air outlet pipe with stop cock. This section concerns the testing of storm sewer trunk lines, laterals, manholes, and appurtenances. 2. A. Test procedures and recording methods have been submitted and approved. Perform the water test procedure to determine the quality of the sewer line against infiltration and exfiltration only when specifically approved by Little Rock Wastewater. When sewer main diameters are 24-inches and smaller; unless water table is 2-feet or more above the top of pipe at upstream end of main or the calculated air test pressure is greater than 9 psi. For every foot of

testing. The test time, tables and procedures are based on the ASTM C828 Test Introduce low-pressure air into the plugged line. Acceptance testing criteria and procedures for sanitary sewers below are mandatory: 1. 2.

C. Procedure . The manhole shall then be backfilled and re-tested 8 The vacuum testing of the manholes shall be done prior to air testing the sewer lines that enter of exit the manhole. Lines must be cleaned by flushing or by other means before the low-pressure air test is to begin. 11.2.3.1 Air Test Procedure (Dry Conditions) The following procedure shall be used during the low -pressure air testing of sewer mains

3.4 TESTING GRAVITY SEWER PIPING A. Low-pressure Air Test: 1. PART 1 GENERAL 1.01 DESCRIPTION A. The Conclusion Our entire team is at your disposal to meet your specific needs. Visual inspection of sewer pipes.

Acceptance testing criteria and procedures for sanitary sewers below are mandatory: 1. If the sewer lines can be filled with water and hold the water for typically 10 to 20 minutes - then the test has passed and the sewer lines are intact. Sewer smoke testing is the most cost effective method to find sources of surface water inflow & infiltration - the leading cause of wet weather SSO's. Fast and easy to do, smoke testing produces immediate results that can be acted on quickly - often at minimal expense to the municipality. Identify test areas: Identify areas of the sanitary sewer system that experience inflow during wet weather.

This insures and verifies that there is an adequate .

2. . 3. In our video, the primary sources of inflow that we target are storm inlets that are directly or indirectly connected to the sanitary sewer system. When the petcock is closed, the water is pressurized to 3.5 psig above the pressure exerted by the groundwater. This test can often be conducted the . A water test is then done by introducing water into a void volume until water flows evenly from the open petcock. 11.2.3.1 Air Test Procedure (Dry Conditions) The following procedure shall be used during the low -pressure air testing of sewer mains Locate the positions of the manhole on the ground along the longitudinal section of the sewer line. 1. 2. Close the valve on the vacuum line and shut off the vacuum pump.

A crew can easily test 10,000 linear feet of sewer line in an eight-hour period. Introduce air pressure slowly to approximately 4 psig. not to cause a failure of this test. Preparation of the Sewer Line 6.1 The sewer shall should be free of debris prior to testing. 4. 3. Mandrel pull test after backfill is placed and stable at grade for 30-days. 3. Measurement and Payment Procedures 1. PART 1 GENERAL 1.01 DESCRIPTION A. 2. The pipe line is then inspected. 1.1 This practice provides procedures for testing non-pressure plastic pipe sewer lines, using low-pressure air to prove the integrity of the installed material and the construction procedures. Setting out Sewer Centre Line 2. required for testing sewer pipe joints by applying a positive air pressure to the joints, . Plug all sewer inlets and outlets and cap and seal all maintenance shafts, inspection opening shafts and risers in the test length of sewer.

Introduce air pressure slowly to approximately 4 psig. On all sanitary sewer lines (plastic composite and ductile iron), including private sewer lines, the Contractor shall conduct a line acceptance test using low-pressure air testing. 2.

Test each section of gravity sewer piping between manholes. Make the installation through manhole wall on top of the sewer line where line enters manhole. then fill the test section with water up to 5 metres and monitor the water level; this means 0.5 bar because a water level of 5 metres is equal to 0.5 bar (50 kPa). 1.

Perform test in accordance with applicable portions of ASTM 828 and ASTM 924. How is a sewer pressure test typically performed? 3.4 TESTING GRAVITY SEWER PIPING A. Low-pressure Air Test: 1. Test each section of gravity sewer piping between manholes.

Apply an initial test vacuum pressure (negative pressure) of approximately 27 kPa. On all sanitary sewer lines (plastic composite and ductile iron), including private sewer lines, the Contractor shall conduct a line acceptance test using low-pressure air testing. Testing can be performed on various types of sewer pipe including newly installed or however pre-existing lines.

If a sewer line is holding water, this is often referred to as a "belly in the line." Isolation Testing Procedures. Lines must be cleaned by flushing or by other means before the low-pressure air test is to begin.

If the sewer lines are unable to fill or they lose water once filled, then a leak exists. Backfilling of Trenches. Isolate the sewer line to be tested with the plugs referenced above and ensure that all other outlets from which air could . Lines must be cleaned by flushing or by other means before the low-pressure air test is to begin. 3.2 PREPARATION A. Sewer Testing for Straightness of Alignment and Obstruction. PART 2 PRODUCTS Also cost effective solution.

Mandrel testing for flexible sewer pipes. 6 Steps to Performing a Smoke Test 1. 2. An air test is performed by plugging each end of the lateral and applying 3.5 psi to the section under test. For ductile . Simple, fast and efficient quality control tests. Backfilling of Trenches. Two procedures are included to find the rate of air leakagethe constant-pressure method and the time-pressure drop method. For every foot of Standard Operating Procedure Dye Testing REV 0 Purpose: Dye testing of sanitary sewer drains is required during all new building construction, building renovations, and any time a building plumbing fixture is connected to a drain line. 2. In the low-pressure air test, the sewer line to be tested is plugged at both ends, air is introduced at low pressure into the plugged line and the amount of air loss during a specified time period is mea- sured. 1.

There are two main reasons to conduct a visual inspections of a sewer: 1) To identify and fix a problem that has suddenly created an emergency This test ball prevents any water from exiting the under slab piping once filled. 3.6 JOINT TESTING PROCEDURE FOR MAINLINE SEWER AND LATERALS . Steps for the water leak test. Leakage is determined by measuring the flow through the opening in the downstream plug for at least . A "Dye Test Payment" form must be completed and a $350 fee paid prior to scheduling a dye test. This test is used for line acceptance or leak location. The cost is only a few cents per foot for labor, blower, and smoke product. Start flushing the toilet several times, or run the water into the sink for several minutes. Finally, the drop in pressure is measured over 10 seconds. Determine groundwater elevation above spring line of pipe. Test procedure - Vacuum air test.

B. Infiltration Test: Minimum test time is 2 hours. When sewer main diameters are greater than 24-inches. This section describes the requirements and procedures for leakage and infiltration testing of gravity sewer systems, in accordance with ANSI/ASTM C828, Low Pressure Air Test of Vitrified Clay Pipelines. C. Procedure Note: Conduct deflection test prior to low-pressure air test. PART 2 PRODUCTS The The center line pegs of the sewer are driven at a distance of every 7.5 m or 15m. The test starts by pulling the mandrel from one end of the pipe to the other. Alignment and Gradient of Sewers 3. The sewer line is watched by moving along the trench and the joints which leak or sweat are repaired. Make the installation through manhole wall on top of the sewer line where line enters manhole. This type of test is used to determine that the ovality of the sewer pipe meets its specification.

sewer line installation. Include all costs for testing, required by this Section in the bid prices for manholes, pipe, and appurtenant structures. Isolate the sewer line to be tested with the plugs referenced above and ensure that all other outlets from which air could escape are . A.

A "Dye Test Payment" form must be completed and a $350 fee paid prior to scheduling a dye test. A positive test for in-filtration or ex-filtration. 7 If a manhole fails the vacuum test, the manhole shall be uncovered and the leak repaired by patching the exterior of the manhole. STORM SEWER SYSTEM TESTING .

1.

3rd step: Fill the water through the Bypass connection, and discharge the air by using the ADA (Air .